Featured Project Return to Projects List
Carquinez Bridge
Project Information
- Project Location:
- Vallejo, CA
- Status:
- Completed
- Structure Type:
- Bridge
Scope Of Work
Silverado removed three elevated approach ramps to the Carquinez Bridge. The existing eastbound and westbound on ramps and the westbound off ramp. The connecting ramps were approximately 1,200 feet long concrete spans on steel composite girders. The westbound off ramp to Crockett was a 900 foot long steel truss bridge. All told, over 3,000 tons of steel and 10,000 cubic yards of concrete were off hauled for recycling.