Featured Project Return to Projects List
Clearwater Renewable Resource Facility
Project Information
- Project Location:
- Tucson, AZ
- Approx Contract:
- $10,000,000
- Status:
- Completed - Jan 2003
- Structure Type:
- Sewage / Water Treatment Plant
Scope Of Work
Construction of eleven recharge basins (2 million cubic yards of excavation), two miles of 54 inch mainline HDPE pipe with 42 inch HDPE laterals to each basin. 42in., 30in., 24in. and 20in. steel inlet pipe and valves, concrete distribution structures at each basin and the electrical and instrumentation for the system.