![Logo](https://pvu.thebluebook.com/inc/img/qp/161833/mark-young-construction-inc-logo.png?quality=90&width=120&height=120&mode=pad)
Featured Project Return to Projects List
Adams 12 Horizon High School Renovation
Project Information
- Project Location:
- Thornton, CO
- Status:
- Completed
- Structure Type:
- Education (K-12)
Scope Of Work
MYC provided CM/GC services for Adams 12 Five Star Schools after a competitive interview process. The project was phased into two summers and is for a 279,128 SF, two-story building in Thornton. The renovations and upgrades throughout the facility include general renovations to ceilings, walls, floors, windows, common areas, and classrooms. MYC repaired building floor structures and added exhaust fans in the crawlspace. We replaced two existing water-cooled chillers with two air-cooled chillers and three associated pumps to upgrade HVAC systems for efficiency and temperature control for improved comfort. MYC also relocating electrical control panels from the irrigation pit to the ground level enclosure for safety and upgraded the emergency response and security camera systems.