S
Featured Project Return to Projects List
North Carolina Department of Transportation Equipment Shop
Project Information
- Project Location:
- Newton, NC
- Status:
- Completed - Sep 2008
- Structure Type:
- Misc Project
Scope Of Work
Streamline completed this new 9,000 SF Equipment Shop for the NC Department of Transportation (NCDOT). The building includes office, parts storage, a break-room, tire change area, wash bay, and 4 pull through service bays that have vehicle lifts and bridge cranes. The effort also included grading, storm drainage, erosion control, site utility installation, an asphalt parking lot, and a sewer lift station. NCDOT nominated Streamline for a Certificate of Merit from the state of NC.
Date of Completion: September 2008
Green Items: Waste oil recycling, energy efficient lighting and heating systems.