KBR Building Group

Share

Greenville, SC 29601

Company Info

  • Size 250-499 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Future Beef Operations

Project Information

Project Location:
Arkansas City, KS
Status:
Completed
Structure Type:
Misc Project

References

Architect:
VCP&A

Scope Of Work

Our scope of work for Future Beef Operations’ beef processing plant included the building and process design; equipment arrangements; equipment selection, procurement, and installation; and all related construction services. This 385,000 sf state-of-the-art facility is capable of processing 1,725 head of cattle per day – from live animal to case-ready meat. It includes areas for producing ground beef, cooked meat, and pet food, as well as a tannery. An 8,000 sf Central Utility Building (CUB) was constructed housing all refrigeration support, steam generation boilers, hot water heaters, a hot water high pressure pump system, compressed air systems, and the facility’s main switchgear. A 12,500 sf Wastewater Treatment Plant was also designed and built on a 12-acre tract that includes clarifiers, aeration basins, anaerobic lagoons, and a holding pond.

Share URL copied!
https://www.thebluebook.com/iProView/358271/kbr-building-group/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.