Logo

MEB General Contractors, Inc.

Share

Chesapeake, VA 23323

Company Info

  • Est. 1982
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Colonna's Shipyard's Building 7 Phase 3

Project Information

Project Location:
Norfolk, VA
Status:
Completed
Structure Type:
Misc Project

References

Architect:
McPherson Design Group
Client:
Colonna's Shipyard

Scope Of Work

MEB was selected as the design-builder of Colonna's Shipyard's Phase 3 expansion project based on our performance on Phase 2. This expansion included additions to the machine and fabrication shop, once again, increasing the Shipyard's capability to pursue work and production.

Phase 3 included a Machine Shop extension and a Fabrication Shop extension, consisting of approximately 22,726 SF of new building additions attached on two ends of the Phase 2 project that was completed by MEB. The facility additions consist of a pre-engineered metal building (PEMB) constructed with a concrete floor slab on piling. The new fabrication shop for phase 3 was designed and constructed to support two 50-ton bridge cranes with limit of one 50-ton bridge crane per bay. The new machine shop for phase 3 was designed and constructed to support three 50-ton bridge cranes with limit of one 50-ton bridge crane per bay. Jib cranes, lathes, cutting machines, and modular offices and bathrooms were installed.

22,726 sf

Project Images

#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/359038/meb-general-contractors-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.