Avondale Marine
Project Information
- Project Location:
- LA
- Status:
- Completed - Jan 2018
- Structure Type:
- Bridge
References
- Client:
- Greater New Orleans Expressway Commission
Scope Of Work
Boh Bros. assisted Avondale Marine – T. Parker Host in rebuilding Dock No. 2 so that Host can use dock’s existing pile-supported ship ways to construct a suspended roadway. Once operational, trucks will be able to carry heavy loads from dock to land, and versa, as roadway will have a 100-ton capacity. All totaled, 39 panels were created using a 5,000 psi concrete, along with rather large, No. 11 reinforcing steel. Three panel sizes were needed to achieve the desired configurations.
In addition to Dock 2 upgrades, Boh also refurbished Wet Docks 3,4, 5 by installing an 8” thick reinforced concreting topping slab across Wet Docks. concrete topping slab increased dock’s capacity from a 5,000 pound passenger truck to HS-20 loading, which allows for a three-axle semitrailer combination weighing 72,000 pounds.