Tallac Creek Bridge | Lake Tahoe Basin
Project Information
- Project Location:
- CA
- Approx Contract:
- $800,000
- Status:
- Completed
- Structure Type:
- Bridge
Scope Of Work
This project consisted of constructing a 20’ by 40” Caltrans approved bridge composed of precast, prestressed concrete voided slabs and paved with an asphalt wearing surface. The slabs bear on new cast-in-place concrete abutments supported on spread footings. The bridge is capable of passing the 100 year flood with one foot of freeboard. Work included a stream bypass and restoration in environmentally sensitive area involving Lahontan Regional Water Quality Control Board, Tahoe Regional Planning Agency and Fish & Game.
Change order work consisted of winterization costs and additional work requested by the owner.