Featured Project Return to Projects List
Lakeside Village Apartments
Project Information
- Project Location:
- San Leandro, CA
- Status:
- Completed - Jan 2001
- Structure Type:
- Apartments & Condominiums
Scope Of Work
Size: 40,500 sq. ft. (4,005 roofing squares)
Building Type: Multi-Residential (apartments)
Scope of Work:
Remove existing wood shake roofing.
Install attic ventilation to meet 1997 UBC requirements.
Install 30 lb ASTM felt underlayment.
Install pre-painted drip and rake edge flashings.
Install Celotex “Dimensional/ 40 Shake” laminated fiberglass shingle roofing. Color” weathered Wood.
Replace penetration flashings with material. flashings shop primed and painted.
Install Elk “Z RIdge” dimensional ridge shingles. Color: Weathered Wood.
Schedule: Project to be completed in three annual phases beginning in 1999. Each phase will be roughly equal in size. Final completion in 2001.