KPE Consulting Engineers

Omaha, NE 68102

Company Info

  • Est. 2000
  • Size 20-49 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

KPE design professionals are also forensic engineering experts. Our staff use the lessons learned from investigating construction defects and the design errors of others to maximize the quality of KPE designs.

KPE is dedicated to providing high quality services that will ensure project delivery on-schedule and within budget. Whether we are working for the building owner, an owners rep, a construction firm, a contractor, an insurance company or a legal advisor, our goal is to always deliver an excellent product in a professional manner.

What We Do

Regions & Counties Serviced

  • Iowa, Omaha, NE

Nebraska 1

  • Sarpy

Our CSI Codes

01 45 26 - Plant Inspection Procedures
01 51 16 - Temporary Fire Protection
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00.00.01 - Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 06 30 - Schedules for Subsurface Investigations
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 19 - Traffic Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 29 - Magnetotelluric Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 08 00.00.01 - Commissioning of Metals
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 01 40 - Operation and Maintenance of Safety Specialties
10 06 40 - Schedules for Safety Specialties
10 08 00.00.01 - Commissioning of Specialties
10 40 00.00.01 - Safety Specialties
10 41 13 - Fire Department Plan Cabinets
10 44 13 - Fire Extinguisher Cabinets
10 44 13.53 - Security Fire Extinguisher Cabinets
10 44 16 - Fire Extinguishers
10 44 16.13 - Portable Fire Extinguishers
10 44 16.16 - Wheeled Fire Extinguisher Units
10 44 33 - Fire Blankets and Cabinets
10 44 43 - Fire Extinguisher Accessories
11 08 00.00.01 - Commissioning of Equipment
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 01 20 - Operation and Maintenance of Fire-Extinguishing Systems
21 05 13 - Common Motor Requirements for Fire-Suppression Equipment
21 06 20 - Schedules for Fire-Extinguishing Systems
21 06 30 - Schedules for Fire-Suppression Equipment
21 08 00.00.01 - Commissioning of Fire Suppression
21 09 00.00.01 - Instrumentation and Control for Fire-Suppression Systems
21 12 13 - Fire-Suppression Hoses and Nozzles
21 12 16 - Fire-Suppression Hose Reels
21 12 19 - Fire-Suppression Hose Racks
21 12 26 - Fire-Suppression Valve and Hose Cabinets
21 20 00.00.01 - Fire-Extinguishing Systems
21 21 16 - Carbon-Dioxide Fire-Extinguishing Equipment
21 24 16 - Dry-Chemical Fire-Extinguishing Equipment
21 41 13 - Pressurized Storage Tanks for Fire-Suppression Water
21 41 29 - Storage Tanks for Fire-Suppression Water Additives
22 08 00.00.01 - Commissioning of Plumbing
23 08 00.00.01 - Commissioning of HVAC
25 08 00.00.01 - Commissioning of Integrated Automation
25 33 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Fire-Suppression Systems
25 53 00.00.01 - Integrated Automation Control of Fire-Suppression Systems
25 93 00.00.01 - Integrated Automation Control Sequences for Fire-Suppression Systems
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00.00.01 - Commissioning of Electrical Systems
27 08 00.00.01 - Commissioning of Communications
28 08 00.00.01 - Commissioning of Electronic Safety and Security
28 31 33.26 - Fire Detection and Alarm Interfaces to Intrusion Detection
28 31 43 - Fire Detection Sensors
28 31 46 - Smoke Detection Sensors
28 31 49 - Carbon-Monoxide Detection Sensors
28 31 53.13 - Fire Alarm Pull Stations
28 33 13 - Fuel-Gas Detection and Alarm Control, GUI, and Logic Systems
28 33 23 - Fuel-Gas Detection and Alarm Integrated Audio Evacuation Systems
28 33 33 - Fuel-Gas Detection Sensors
28 34 13 - Fuel-Oil Detection and Alarm Control, GUI, and Logic Systems
28 34 23 - Fuel-Oil Detection and Alarm Integrated Audio Evacuation Systems
28 34 33 - Fuel-Oil Detection Sensors
31 08 00.00.01 - Commissioning of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
32 08 00.00.01 - Commissioning of Exterior Improvements
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 80 00.00.01 - Commissioning of Process Systems
41 08 30 - Commissioning of Manufacturing Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 08 40 - Commissioning Water Treatment Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 08 00.00.01 - Commissioning of Electrical Power Generation

Project Experience

  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Service Work/Repairs

Gallery

Featured Image 1
Greenbelly at Aksarben Village
Featured Image 2
Craft Axe Throwing
Featured Image 3
Pinhooks Flats at Aksarben Village
Featured Image 4
Ipers

Associations & Memberships

ACEC (American Council of Engineering Companies)
ACEC (American Council of Engineering Companies)
USGBC (United States Green Building Council)
USGBC (United States Green Building Council)
Share URL copied!
https://www.thebluebook.com/iProView/594538/kpe-consulting-engineers/engineers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.