Featured Project Return to Projects List
480V Electrical Control Panel
Project Information
- Project Location:
- x, NJ
- Status:
- Completed
- Structure Type:
- Manufacturing Plant
References
- Owner:
- Food Processing Plant
Scope Of Work
Industry: Food
Application: 480V Electrical Control Panel
Savings: Overall savings to client……..over $600,000
Downtime on the packaging line was reduced from 42-48 days to 4 days. Cost of labor and materials was less than 30% of OEM pricing.
Issue: Fire damaged European made electrical control box
Problem: The panel was built in Europe. The client would have waited 6-8 weeks to get a replacement from overseas. This particular control
panel controlled one of 4 chopped lettuce packaging lines, meaning that 25% of production was down. Our hero customer was facing the possible loss of major customer accounts if he couldn’t deliver product on time.
Alternatives: Wait 6-8 weeks for delivery from Europe. Pay higher OEM prices.
Solution: Marshall Industrial Technologies Electrical Service Group responded to the emergency immediately and transported the damaged control panel to our shop where our technicians provided new back panel, relays and connections and re-energized the packaging system in 4 days.
Heartwarming Success: Our hero customer was able to maintain deliveries to all of his key customer accounts thereby preventing monumental revenue losses and serious damage to his reputation.
Other Applications: Marshall’s skilled Electrical Service technicians can build or re-build electrical control and distribution systems both in house and on site.
Industry: Food
Application: 480V Electrical Control Panel
Savings: Overall savings to client……..over $600,000
Downtime on the packaging line was reduced from 42-48 days to
4 days. Cost of labor and materials was less than 30% of OEM pricing.
Issue: Fire damaged European made electrical control box
Problem: The panel was built in Europe. The client would have waited 6-8
weeks to get a replacement from overseas. This particular control
panel controlled one of 4 chopped lettuce packaging lines, meaning
that 25% of production was down. Our hero customer was facing the possible loss of major customer accounts if he couldn’t deliver product on time.
Alternatives: Wait 6-8 weeks for delivery from Europe. Pay higher OEM prices.
Solution: Marshall Industrial Technologies Electrical Service Group
responded to the emergency immediately and transported the damaged
control panel to our shop where our technicians provided new back panel,
relays and connections and re-energized the packaging system in 4 days.
Heartwarming Success: Our hero customer was able to maintain deliveries to all of his key customer accounts thereby preventing monumental revenue losses and serious damage to his reputation.
Other Applications: Marshall’s skilled Electrical Service technicians can build or re-build electrical control and distribution systems both in house and on site.