Logo

Kiewit Infrastructure West Co.

Santa Fe Springs, CA 90670

Company Info

  • Est. 1884
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Henderson 2000

Project Information

Project Location:
Empire, CO
Status:
Completed
Structure Type:
Terminal - Airport / Bus / Railroad

Scope Of Work

TIC was the general contractor for the installation of 10.5 miles of underground conveyor, 4.5 miles of above ground conveyor, and underground crusher installation. This was the world’s longest single-flight conveyance system at the time of installation.

TECHNICAL DETAILS

A Fuller 54” x 84” crusher

10,000 cy concrete

2,500 tons of building steel

708 tons of drive structural steel

14,803 lf of pipe

25,000 lf conduit

32,770 ft of HV wire

76,000 ft LV cable

146,834 ft of instrument cable

6,820 ft of cable tray

84,000 ft of ground wire

Share URL copied!
https://www.thebluebook.com/iProView/721408/kiewit-infrastructure-west-co/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.