Spillway Modification / Poplar Island
Project Information
- Project Location:
- Talbot County, MD
- Approx Contract:
- $900,000
- Status:
- Completed - Apr 2017
- Structure Type:
- Marine
References
- General Contractor:
- Marine Technologies, Inc.
- Client:
- US Army Corps of Engineers
Scope Of Work
This project is located on Poplar Island at Spillway 1, Talbot County, Maryland. The primary goal of this project was to complete the following modifications to Spillway 1:
a) Raising the existing catwalk structure by 8' 6";
b) Slip lining two of the existing discharge CMP located at the Spillway with SnapTite HDPE pipe and Grout Annular space underwater;
c) Demolish two existing steel structures;
d) Cap/seal the T-weir pipe connecting to Spillway 1;
e) Plugging (capping/filling in) of three existing Spillway structures (#'s 3, 7, and 10).