Featured Project Return to Projects List
Anacostia River Tunnel at RFK Stadium
Project Information
- Project Location:
- Washington, DC
- Approx Contract:
- $5,300,000
- Status:
- Completed - Aug 2014
- Structure Type:
- Tunnel
References
- Owner:
- Impregilo Healy Parsons JV
- Architect:
- General Contractor:
- Client:
-
Shane
Yanagisawa
-
Project Manager
(360) 606-4375
Scope Of Work
A joint effort between our electrical and civil divisions, our work included nearly 1 mile of Pepco High Voltage Ductbanks with significant safety supervision, 9 conduits encased in concrete, 14 electric manholes through RFK parking lot to serve one of the drilling operations for the DC Clean Rivers project, and restoration of the surface. As of early July 2014, the ductbank work was almost complete. Our team backfilled their trenches and final paving occurred mid-July to restore and extend the surface. Two electricians will remain on site for 3-5 years beyond the base contract dates to provide continuous support as needed like data/communication lines.