People Also View These
Loading...
Our Story
Established in 1992, Hardee Brothers Grading, Inc. is a a licensed excavating and concrete contractor serving Eastern North Carolina. Let us handle all your commercial and residential demolition, excavating and concrete needs such as storm drainage, retaining walls and asphalt and concrete paving. Landscape construction packages are also available.
Commercial Experience
Hospital / Nursing Home
Non-Residential Building
Animal Hospital / Kennel
Apartments & Condominiums
Assisted Living
Athletic Field
Auto Dealership / Service
Bank
Church / Synagogue
City / Town Hall
Civil & Site Development
Club House / Community Center
Court House
Data Centers - Mission Critical
Design Build
Education (K-12)
Fire / Police Station
Fitness Center
Gas Station
Golf Course
Government
Grocery Stores
Historic Preservation
Hotel / Motel
House
Industrial Maintenance
Jail / Prison
Laboratory
Library
Manufacturing Plant
Medical Office
Military
Misc Project
Mixed Use
Museum
Non-Building Construction
Office Building
Park / Playground
Parking Garage
Parking Lots
Post Office
Pre-Manufactured Structures
Radio / Television Station
Renewable Energy
Residential Building
Restaurant
Retail Store
School / College / University
Single Family Residential
Storage Facility / Warehouse
Swimming Pool
Tennis Court
Theater
Utilities
Regions & Counties Serviced
- North Carolina and Upstate South Carolina
North Carolina 37
- Beaufort
- Bertie
- Bladen
- Brunswick
- Camden
- Carteret
- Chowan
- Columbus
- Craven
- Currituck
- Dare
- Duplin
- Edgecombe
- Gates
- Granville
- Greene
- Halifax
- Harnett
- Hoke
- Johnston
- Lenoir
- Martin
- Nash
- New Hanover
- Northampton
- Onslow
- Pasquotank
- Pender
- Perquimans
- Pitt
- Scotland
- Tyrrell
- Vance
- Wake
- Washington
- Wayne
- Wilson
Our CSI Codes
01 57 13 - Temporary Erosion and Sediment Control
01 94 13 - Facility Decommissioning Procedures
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 58 13 - Snow Fencing
03 01 70 - Maintenance of Mass Concrete
03 06 70 - Schedules for Mass Concrete
03 11 13.13 - Concrete Slip Forming
03 35 23 - Exposed Aggregate Concrete Finishing
03 35 26 - Grooved Concrete Surface Finishing
03 70 00.00.01 - Mass Concrete
03 71 00.00.01 - Mass Concrete for Raft Foundations
03 72 00.00.01 - Mass Concrete for Dams
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
32 16 13.13 - Cast-In-Place Concrete Curbs and Gutters
32 16 13.16 - Cast-In-Place Concrete Curbs
32 16 13.19 - Cast-In-Place Concrete Gutters
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.23 - Structural Soil Mixing
32 92 13 - Hydro-Mulching
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
34 82 19 - Bridge Pier Protection
35 31 29.40 - Stone Groins
35 41 16 - Levee Cutoff Trenches
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection