Bayport Container Ship Terminal, Phase 1A
Project Information
- Project Location:
- Bayport, TX
- Approx Contract:
- $6,000,000
- Status:
- Completed
- Structure Type:
- Marine
References
- Owner:
- Port of Houston Authority
- General Contractor:
- Zachery Construction Corporation
- Client:
- Ocean Breeze Construction Co. Inc.
Scope Of Work
AIDC was tasked with:
- Checking Sub-Grade for smoothness and make level at a 2 to 1 slope,
- Cleaning soil build up in the shadows of the piers,
- The installation of approximately 258,000.sq ft of cast-in-place articulating fabric form block mats,
- The Installation of 2,000 - 1.25" x 6' DYWIDAG Thread Bars,
- Connecting each mat to the corresponding Thread Bar,
- Zippered mats together in between each pile,
- Jetted a 2' deep trench at the toe of each mat,
- Placed grout into approx.102 fabric forms on a 2 to1 slope under the pier, and
- Grouted the gaps around the base of each pile.
at the Bayport Container Ship Terminal Complex, Phase 1A
The duration of this project was 450 days, with 8 crews, using Nitrox diving compressors, with zero diving accidents.
This project was completed on time and under budget.