Featured Project Return to Projects List
100-108 PATERSON AVENUE
Project Information
- Project Location:
- HOBOKEN, NJ
- Status:
- Completed - Sep 2018
- Structure Type:
- Misc Project
References
- Owner:
- Not Provided
- Architect:
- MINERVINI VANDERMARK ACHITECTURE
- General Contractor:
- MOLFETTA CORP
- Client:
- SOUTHWEST-I DEVELOPMENT LLC
Scope Of Work
APPLY STUCCO SYSTEM on REAR WALL at BACKYARD OF THE BUILDING
- Complete installation of California Stucco System for the rear wall in backyard of the building only (interior and exterior except the wall on Paterson street)
- Complete installation of wire lath 2.5
- Complete installation of scratch coat as first layer
- Complete installation of hard coat as second layer
- Expansion joints will be required to break big walls into small panels easy to work with
- Complete application of synthetic stucco will be the third and final coat
- Complete application of backer rod and caulking to all windows, where the stucco is applied only
MODULAR BRICK INSTALLATION
- To install modular red brick as per specs.
- To install 1- ½” rigid insulation as per specs.
- To install wall ties @16” each direction.
- To install mortar net at grade level and on top of steel angles.
- To install self-sticking flashing.
- To install weep holes @16” horizontally.
- To install backer rod and caulking to all windows where the brick will be installed.
- To washing brick after finish.