EPC Services Co.

Share

Billings, MT 59102

Company Info

  • Est. 1985
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Jensen-Dinosaur Line Rebuild

Project Information

Project Location:
Uintah County, UT
Status:
Completed
Structure Type:
Utilities

Scope Of Work

Moon Lake Electric Association requested a design to replace the existing 23.5-mile 69 kV Jensen-Dinosaur line.  The new line, like the existing line, is a wood pole line consisting predominantly of monopole structures.  Wood H-Frame and three-pole structures are utilized for 2.7 miles between the Jensen station and the Green River on the west end of the line.  Additionally, wood H-Frame and three-pole structures are utilized in other portions of the line where terrain dictates longer spans and for the transition into the MAPCO station.

The conductor for the line is 4/0 ACSR “Penguin” with 477 kcmil 26/7 Strands ACSR “Hawk” in 3 spans at the crossing of the Green River.  The line is shielded by an AFL 48-fiber OPGW.  The line includes a drop into the MAPCO station which involves replacing the main station wood pole H-frame structure while reutilizing the existing equipment on the structure.  The line also includes a new three-way phase-over-phase switch at the Dinosaur Tap

Share URL copied!
https://www.thebluebook.com/iProView/882492/epc-services-co/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.