Company Info

  • Est. 1954

People Also View These
Loading...

Our Story

Located along the Mississippi River, our office serves central Minnesota. We provide a full range of surveying and engineering services for local and state government as well as commercial entities.

Our projects include engineering design for complex transportation networks, municipal infrastructure, and site development. You’ll find our work throughout the city and surrounding communities.  University Drive, Beaver Island Trail, Lake George Fountain in St. Cloud. The County Road 120 Roundabouts in Sartell. The Downtown Streetscape in Sauk Rapids.

We live here, and we’re committed to improving the places we call home.

What We Do

Commercial Experience

Misc Project
Civil & Site Development House Office Building Single Family Residential

Regions & Counties Serviced

  • Minnesota - Minneapolis / St. Paul
  • North and South Dakota

Minnesota 1

  • Stearns

Our CSI Codes

01 32 23 - Survey and Layout Data
01 45 26 - Plant Inspection Procedures
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00.00.01 - Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 06 30 - Schedules for Subsurface Investigations
02 08 00.00.01 - Commissioning of Existing Conditions
02 21 13 - Site Surveys
02 22 19 - Traffic Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 29 - Magnetotelluric Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 08 00.00.01 - Commissioning of Metals
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 08 00.00.01 - Commissioning of Specialties
11 08 00.00.01 - Commissioning of Equipment
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 08 00.00.01 - Commissioning of Fire Suppression
22 08 00.00.01 - Commissioning of Plumbing
23 08 00.00.01 - Commissioning of HVAC
25 08 00.00.01 - Commissioning of Integrated Automation
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00.00.01 - Commissioning of Electrical Systems
27 08 00.00.01 - Commissioning of Communications
28 08 00.00.01 - Commissioning of Electronic Safety and Security
31 08 00.00.01 - Commissioning of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
32 08 00.00.01 - Commissioning of Exterior Improvements
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 80 00.00.01 - Commissioning of Process Systems
41 08 30 - Commissioning of Manufacturing Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 08 40 - Commissioning Water Treatment Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 08 00.00.01 - Commissioning of Electrical Power Generation

Project Experience

  • Service Work/Repairs

Gallery

Featured Image 1
Services
Featured Image 2
Services
Featured Image 3
Services
Featured Image 4
Services
Service Area and Locations Map for Stantec

Associations & Memberships

The Blue Book Network
The Blue Book Network
ASLA (American Society of Landscape Architects)
ASLA (American Society of Landscape Architects)
ACEC (American Council of Engineering Companies)
ACEC (American Council of Engineering Companies)
USGBC (United States Green Building Council)
USGBC (United States Green Building Council)
Share URL copied!
https://www.thebluebook.com/iProView/897534/stantec/vendor-services/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.