Manhattan Construction Co.

Share

Arlington, VA 22201

Home Contact Us

Company Info

  • Est. 1896
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Florida Gulf Coast University Alico Arena

Project Information

Project Location:
Fort Myers, FL
Status:
Completed
Structure Type:
School / College / University

Scope Of Work

Manhattan completed the 120,000 square-foot Florida Gulf Coast University Alico Arena in 2002. The facility was constructed to serve as a teaching gymnasium and includes a three-court multipurpose gymnasium with performance court and seating for 4,500 with six suites, team locker facilities, 7,600 square-foot fitness center with cardiovascular and strength areas, 1,600 square-foot dividable aerobics and combative rooms, an auxiliary gymnasium, a training room, and a jogging track/performance concourse as well as faculty offices, an administrative center and conference rooms. Manhattan was able to generate a list of viable Value Engineering items that produced a minimum of $658,000 in savings. The project was designed to meet the needs of the university’s students and athletic programs while incorporating the needs of Lee County’s local programs. Well into the project’s original construction, FGCU and Manhattan teamed with the Lee County Emergency Department to provide for a hurricane shelter. The building’s original design was revised to include elements of “hardening” based on the Miami-Dade Hurricane Standards. This project was completed on-time, on-budget, at the highest level of quality possible.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/935996/manhattan-construction-co/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.