Logo

Thermotech, Inc.

Harrisburg, PA 17111

Company Info

  • Est. 1981
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Burlington Coat Factory

Project Information

Project Location:
Harrisburg, PA
Approx Contract:
$100,000
Status:
In-Progress - Nov 2019
Structure Type:
Retail Store

References

General Contractor:
Fylnn Construction

Scope Of Work

1.Plumbing 

a.Provide rough-ins for DWV piping and insulated copper water piping. 

b.Provide fixture package as specified.  Includes all accessories for fixtures. 

c.Set, assemble and connect fixtures as needed.  Includes relocation of existing water 

heater and new accessories for recirculating hot water, floor drains, cleanouts, etc. 

2.HVAC 

a.Provide Carrier ductless heat pump equipment and accessories. 

b.Provide rigging for rooftop equipment as needed. 

c.Provide/install metal duct package as specified.  Provide fittings, flex connectors, pipe, 

insulation, etc. 

d.Provide/install exhaust fans/accessories, electric unit heater, and electric cabinet heaters 

as specified. 

e.Provide/install GRD package including concentric style for rooftop unit 4. 

f.Provide roof rails and portal for ductless system. 

g.Provide related demo as required and alterations to existing ductwork/rooftop unit as 

specified. 

h.Provide condensate drains for ductless system. 

i.Startup equipment and set up appropriately.  Replace air filters. 

 

Share URL copied!
https://www.thebluebook.com/iProView/945892/thermotech-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.