Newark Airport Runway
Project Information
- Project Location:
- Newark, NJ
- Approx Contract:
- $20,000,000
- Status:
- Completed
- Structure Type:
- Airport Runway
References
- Client:
- Port Authority of New York and New Jersey
Scope Of Work
Hundreds of flights carrying thousands of passengers fly out of Newark each day. To meet increasing demands, the Port Authority of New York and New Jersey (PANYNJ) needed to extend its main runway closest to the terminal to accommodate pilots carrying heavier loads requiring longer takeoffs.
Conti added 1,800 feet on runway to the current 8,200 foot strip. Because the concrete needed to be as strong and long lasting as possible, the team utilized a “first ever” mix design with four aggregates instead of the conventional three.
In addition to the special concrete mixture used on the runway extension, Conti took advantage of a unique slip-form process to frame the concrete. This process called for the use of a machine to drop the concrete from a conveyor between two steel guides placed 25 feet apart. The machine slowly moved down the length of the runway pouring a depth of 16 inches of material for the first layer. After the first layer was poured, Conti crews placed reinforcing mesh on top, and then applied a second four-inch concrete layer. Another crew then utilized a “rolling bridge” to smooth and finish the surface. This project was also the first time the slip-form paving had been done at Newark Liberty International Airport.
|