Newark-Elizabeth Rail Link Extension

Project Information

Project Location:
Elizabeth, NJ
Approx Contract:
$60,000,000
Status:
Completed
Structure Type:
Terminal - Airport / Bus / Railroad

References

Client:
New Jersey Transit

Scope Of Work

Conti helped link historic and modern downtown Newark, enabling the city to continue to set the standard for urban transformation.

A significant part of the redevelopment of downtown Newark, New Jersey’s largest city, was the Newark-Elizabeth Rail Link (NERL) extension project. This high-volume urban commuter light rail connects the newly upgraded Penn Station with the historic Broad Street Station on the Morris and Essex line to  a new Performing Arts Center, Bear’s Baseball Stadium and Washington Park.

Conti was the general contractor for the project, constructing three miles of embedded track work with catenary structures for power traction, new signal systems and five new station stops. The team performed a complex scope of work, including excavation requiring temporary retaining structures, at-grade site improvements, retaining walls, underground tunnel work, rail bridges, roadway work, structural and architectural work, concrete pouring and asphalt paving.

The team was responsive and flexible to the needs of the project. For example, when the State Historical Preservation Office saw one of the rail bridges held historic significance, the team rehabilitated it instead of constructing a new bridge. Repairs were more significant than anticipated by the , so Conti set up a drill punch metal fabrication area on site so panels were expedited and schedule was maintained.

Conti  the project on an aggressive schedule working in a bustling urban environment over 10 major roads and next to very active highways. Conti coordinated tie-ins to live rail tracks, working around the clock to minimize track closures. The team kept in constant communication with local businesses in order to sequence work to meet stakeholder needs.

Constructed five stations

Constructed rail catenary structures

 three miles of track work with new signals

Maintained and protected traffic

Installed and relocated utilities

Demolished existing facilities

Disposed of contaminated soil

 site restoration and landscaping

 

Share URL copied!
https://www.thebluebook.com/iProView/946836/conti-civil/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.