A
Featured Project Return to Projects List
East Fork Pump Station
Project Information
- Project Location:
- Combine, TX
- Status:
- Completed
- Structure Type:
- Mixed Use
References
- Owner:
- North Texas Municipal Water District
- Architect:
- Alan Plummer & Associates
Scope Of Work
This project consisted of the construction of the East Fork Raw Water Supply Project, Conveyance Pump Station. The pump station has been designed for three pumps with the ability to increase to five pumps and includes three vertical turbine pumps—one constant speed and two variable speed. The pump station includes all five pump cans or barrels and anchor bolts, all sized for future pumping conditions. The operating level is at grade for the pumps, motors, valves, discharge piping and electrical gear.