Archer Western Contractors

Share

Charlotte, NC 28226

Company Info

  • Est. 1983
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Easterly Tunnel Dewatering Pump Station

Project Information

Project Location:
Cleveland, OH
Status:
Completed
Structure Type:
Tunnel

Scope Of Work

The Northeast Ohio Regional Sewer District faced an overflow of roughly 4 billion gallons of untreated water into Lake Erie every year. This project included the excavation and construction of a cavern-style pump station connected to a 3-mile-long single-pass precast concrete-lined storage tunnel that significantly reduces raw water overflow and improves the environmental status of the region. The project consisted of two 40-foot-diameter 242-foot-deep shafts, a cavern pump station located 240 feet below ground, a 12,615-square-foot pump building at grade level and associated building and site work.

Share URL copied!
https://www.thebluebook.com/iProView/968453/archer-western-contractors/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.