Featured Project Return to Projects List
DCR Bajko Rink
Project Information
- Project Location:
- MA
- Status:
- Completed
- Structure Type:
- Government
Scope Of Work
G.V.W. completed locker room additions and a Zamboni garage addition to the Bajko Memorial Rink. The addition was complete with masonry to match existing conditions. A new snack bar was installed in the lobby addition. Resilient flooring was installed throughout the locker rooms and epoxy flooring for the showers. Acoustical ceilings and suspended drywall systems were installed in specific rooms.