Logo

Griffith Brothers, Inc.

Fallston, MD 21047

Company Info

  • Est. 1977
  • Size 20-49 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Griffith Brothers Inc. has been in business since 1977.

Our main lines of business include: Retaining Wall Systems, Soil Erosion Control, Pavers--Interlocking & Unit.

We are located in the Fallston, Maryland area.

What We Do

Regions & Counties Serviced

  • Washington D.C.

Delaware All

District Of Columbia All

Maryland All

Pennsylvania 9

  • Berks
  • Bucks
  • Chester
  • Delaware
  • Lancaster
  • Lehigh
  • Montgomery
  • Northampton
  • Philadelphia

Virginia 12

  • Arlington
  • Caroline
  • Clarke
  • Culpeper
  • Fairfax
  • Fauquier
  • King George
  • Loudoun
  • Prince William
  • Spotsylvania
  • Stafford
  • Warren

Our CSI Codes

01 57 13 - Temporary Erosion and Sediment Control
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 58 13 - Snow Fencing
04 22 33 - Interlocking Concrete Unit Masonry
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
07 76 13 - Roof Ballast Pavers
07 76 16 - Roof Decking Pavers
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 36 13 - Gabion Boxes
31 36 19 - Gabion Mattresses
31 36 19.13 - Vegetated Gabion Mattresses
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
31 53 13 - Timber Cribwork
31 72 13 - Rock Reinforcement and Initial Support
32 01 90 - Operation and Maintenance of Planting
32 01 90.13 - Fertilizing
32 01 90.16 - Amending Soils
32 01 90.19 - Mowing
32 01 90.23 - Pruning
32 01 90.26 - Watering
32 01 90.29 - Topsoil Preservation
32 01 90.33 - Tree and Shrub Preservation
32 05 33 - Common Work Results for Planting
32 06 30.13 - Retaining Wall Schedule
32 06 90 - Schedules for Planting
32 06 90.13 - Planting Schedule
32 11 33 - Cement-Treated Base Courses
32 14 13 - Precast Concrete Unit Paving
32 14 13.13 - Interlocking Precast Concrete Unit Paving
32 14 13.19 - Porous Precast Concrete Unit Paving
32 14 16 - Brick Unit Paving
32 14 23 - Asphalt Unit Paving
32 14 26 - Wood Paving
32 14 40 - Stone Paving
32 14 43 - Porous Unit Paving
32 18 23.13 - Baseball Field Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 34 - Reinforced Soil Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
32 90 00.00.01 - Planting
32 91 13 - Soil Preparation
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.19 - Planting Soil Mixing
32 91 13.23 - Structural Soil Mixing
32 91 13.26 - Planting Beds
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
32 92 13 - Hydro-Mulching
32 92 16 - Plugging
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
32 96 13 - Ground Cover Transplanting
32 96 23 - Plant and Bulb Transplanting
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
34 82 19 - Bridge Pier Protection
35 31 16.16 - Segmental Seawalls
35 31 19.36 - Gabion Revetments
35 31 26.36 - Gabion Jetties
35 31 29.36 - Gabion Groins
35 31 29.40 - Stone Groins
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 42 35 - Slope Protection Bank Protection
35 42 36 - Gabion Bank Protection
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection
35 43 35 - Slope Protection Scour Protection
35 43 36 - Gabion Scour Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection

Project Experience

  • Non-Union
  • Public
  • Private
  • Projects From $5,000 to $5,000,000

Associations & Memberships

NCMA (National Concrete Masonry Assn.)
NCMA (National Concrete Masonry Assn.)

Preferred Brands

Allan Block
Allan Block
Keystone Retaining Wall Systems
Keystone Retaining Wall Systems
Redi-Rock
Redi-Rock
SmartSlope
SmartSlope
Stone Strong Systems
Stone Strong Systems
Versa-Lok
Versa-Lok
Share URL copied!
https://www.thebluebook.com/iProView/394243/griffith-brothers-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.